St. Louis (KSDK) - The Grand MetroLink Station is set to reopen Monday, August 20, along with MetroBus service to the Grand Bridge.
The #70 Grand, #58X Twin Oaks Express, and #410 Eureka Express routes will return to the bridge and connect with the MetroLink station.
A dedication of the new Grand Bridge will take place next month, but the date has not been determined.
KSDK