LIVE VIDEO: Show Me St. Louis    Watch
 

MoDOT plans I-64 work for Friday night, Saturday

12:46 PM, Jan 17, 2013   |    comments
  • Share
  • Print
  • - A A A +

ST. LOUIS (KSDK) - The Missouri Department of Transportation has moved work planned on Interstate 64 to from next week Friday night and Saturday.

The work will be done on the inside lanes of I-64 between Sarah and Kingshighway this weekend because temperatures are expected to be too cold to do the work when originally planned.

The left lane of I-64 will be closed in both directions at 7 p.m. Friday.

The ramp from Vandeventer to westbound I-64 will also be closed for safety reasons.

All lanes should be reopen by 6 p.m. Saturday.

This work is in preparation for the removal of the Taylor and Newstead bridges the weekend of January 25-28. Once the bridges are removed, the three through lanes in each direction between Sarah and Kingshighway will be narrowed and shifted.

These closures are part of an $18 million project.

KSDK

Most Watched Videos